Skip to content

Takeover and audit

Is your app stuck? Let's take back control.

Developer gone, code nowhere to be found, update rejected by Apple, bugs piling up. I start with an audit: you know exactly where you stand and what to do, before spending more.

Sound familiar?

  • The developer no longer answers, or left with the code.
  • You've lost access to your accounts: Google Play, the App Store, the database.
  • An update is rejected by Apple or Google.
  • Bugs are piling up and the launch keeps slipping.

The audit: know where you stand

I review the code, architecture, performance, security and compliance with store rules. Even if your app isn't built with React Native or Next.js.

You get a written report with priorities, then we go through it in a 1-hour video call. Allow 48 hours to a week, depending on the level of detail you need.

Audit

€1,500 excl. VAT

For an existing app.

  • Existing app in trouble or to be taken over
  • Review of the code, architecture, performance, security and store compliance
  • Written report with priorities
  • 1-hour debrief by video call

Prices exclude VAT. VAT not applicable, article 293 B of the French General Tax Code (CGI).

And after the audit?

The report tells you what to do, not just what's wrong. Then it's your call.

  1. You stop there

    The report is yours: you know where your app stands and what to do first, with no obligation to continue with me.

  2. I take over your app

    I send you a tailored proposal, based on what the audit revealed. If your app isn't built with React Native or Next.js, we first check together that I'm the right person to take it over.

  3. The code is lost: we start from scratch

    A scoping phase (€900 excl. VAT) to rewrite the specification, then the package that fits your needs. That's what I did for Nutrigy.

A takeover, in practice

Nutrigy welcome screen: logo, benefits and sign-in button

Nutrigy

Taking over an app after the developer disappeared

  • Mobile app
  • Project takeover
  • Long-term support
  • React Native
  • Expo
  • Supabase

The problem

The previous developer slowed down, then stopped answering. He left with the code, and access to Google Play was blocked. The launch was several months behind.

The result

  • 2 months of development, versus 3 to 4 months for the previous version
  • no technical bugs reported
  • a complete app that's pleasant to use
  • a client I'm still working with today
Read the case study

I know the store rules

An app can be ready and still get stuck in Apple's review. Before an important demo, Caspario was at risk: no account deletion, which is mandatory for an app that can only be used with an account. I filled in the review form and added access to a deletion request: the review didn't hold up the launch.

Read the Caspario case study

Information

Frequently asked questions

Not sure yet? That's normal.

A free 30-minute call to find where to start.

Talk about your project

Let's talk about your project

Three questions to prepare our call. It takes a minute, and I'll get back to you within 48 business hours.

0 / 2000 characters

Your details are only used to reply to you. Privacy policy

Rather talk it through?

Book a call

Prefer to write? hugo.humez.pro@gmail.com